Trial access temporarily paused.We are completing final fixes before reopening self-service signup.Trial access paused

For Sign manufacturing software

Run the whole sign manufacturing business from quote to final margin.

Use the same job from the commercial brief through delivery, then read the actual result without rebuilding it in a spreadsheet.

Book a demo

01

Quote the build

Keep materials, labour and production detail clear before approval.

02

Run the floor

See owned tasks, current stages and the work waiting behind a constraint.

03

Know the result

Compare supplier spend and labour with the work that was sold.

From enquiry to invoice

The work stays recognisable.

  1. 01 · Understand the request

    Capture the customer, site, scope and next commercial step.

  2. 02 · Agree what will be made

    Keep quote revisions and artwork approvals exact.

  3. 03 · Plan and deliver

    Schedule people, purchase materials and update the job as it moves.

  4. 04 · Learn from the result

    Read actual labour, supplier cost and invoicing before quoting the next one.

One operating system

Sign manufacturing ERP built around the job.

Sign manufacturing crosses sales, design, engineering, print, fabrication, electrical work, suppliers, subcontractors, installation and accounts. SignBas3 keeps those departments on one current job record instead of making each team rebuild the brief in its own spreadsheet, inbox or production board.

The accepted estimate becomes the commercial baseline. Artwork approval controls what may be produced. Materials, purchases, production tasks, schedules, field evidence and actual costs continue the same story through completion. Management can see what was sold, what changed, what the business delivered and what the job returned.

Explore sign production management → · Explore sign job management →

What sign manufacturing software should connect

Operating areaWhat the team needsHow SignBas3 connects it
CRM and estimatingCustomer, site, products, dimensions, materials, labour, outside supply, delivery and installation in a quote the workshop can understand.Structured estimates and revisions preserve the accepted commercial scope as work becomes a job.
Artwork and technical releaseThe current proof, customer comments, approval decision and production-ready files without version doubt.Artwork versions and browser approval stay attached to the job before work is released.
Materials and purchasingRequired substrates, hardware, LEDs, fabricated inputs, supplier orders, receipts and cost evidence.Purchases are raised and received against the job so material readiness and actual supplier cost remain visible.
Production controlDesign, prepress, print, routing, fabrication, paint, assembly, quality, packing and dispatch tasks with clear ownership.Production stages, tasks, remaining effort, blockers, people and equipment context form a live plan.
InstallationCurrent site contacts, dates, scope, documents, photos, items and completion evidence for the crew.The field handoff uses the same job record and returns progress and evidence to the office.
Finance and marginInvoices, supplier spend, labour, production evidence and the accepted price in one commercial result.Estimated-versus-actual reporting closes the job before the accounting handoff to Xero (available), QuickBooks (certification in progress) or MYOB (coming soon).

Made-to-order manufacturing

Control custom work without forcing every sign through one route.

Channel letters, illuminated cabinets, monuments, wayfinding, retail programs, vehicle graphics and wide-format print use different materials, skills and production stages. SignBas3 provides one operational structure while the quote, tasks, products, suppliers, files and schedule describe the route each job actually requires.

That flexibility matters when one project combines printed graphics, routed panels, fabricated frames, electrical components, outsourced work and a fixed installation date. Every department can work from its part of the plan while management retains the complete commercial view.

From enquiry to installed sign

  1. Capture the opportunity. Record the customer, contacts, site, requirements, dates and next commercial action in CRM.
  2. Build the estimate. Price products, materials, labour, production, supplier inputs, delivery and installation with enough structure to run the work later.
  3. Preserve the accepted scope. Keep quote revisions and customer acceptance visible when the commercial record becomes a job.
  4. Approve the artwork. Control proof versions, comments, markup and the final customer decision before production release.
  5. Prepare materials and capacity. Raise purchases, receive inputs, identify constraints and schedule executable work around people, skills and fixed dates.
  6. Run production and quality. Move design, print, fabrication, finishing, assembly and quality tasks forward against the current job.
  7. Complete installation. Give field teams current site information and collect the evidence that closes the operational loop.
  8. Read the margin. Compare accepted revenue with actual labour, materials, supplier spend, production and field effort, then carry approved financial records to accounting.

Connected business systems

Keep operations in SignBas3 and connect the tools your teams already use.

Choose Xero (available), QuickBooks (certification in progress) or MYOB (coming soon) for the accounting handoff. Keep invoices, supplier costs, approved labour and payment status connected to the operational job while finance works in its selected ledger.

Choose Google Drive or Dropbox for job documents and photos, giving office, production and field teams a dependable file structure around the same work.

How to evaluate sign manufacturing ERP

Do not judge a system from an empty dashboard. Put one representative manufactured-sign job through the complete workflow. Use a revised estimate, multiple artwork versions, purchased components, several production departments, outside supply and a site installation. Then confirm each handoff stays understandable without a side spreadsheet or private inbox.

  1. Ask sales to identify the exact scope and margin allowed in the accepted estimate.
  2. Ask artwork and production to find the current approved proof without asking the estimator.
  3. Ask purchasing what must arrive before fabrication or assembly can continue.
  4. Ask the production manager what is ready, blocked, late and next across the workshop.
  5. Ask the installer to open the current site, scope, documents and contacts from the assigned job.
  6. Ask management to explain the difference between estimated and actual cost using evidence on the job.
The real ERP testThe system should keep a custom sign job commercially and operationally recognisable as it crosses every department—from the first request to the final margin.

Questions sign manufacturers ask

Is SignBas3 only production scheduling software?

No. Scheduling is one part of the core app. SignBas3 connects CRM, estimating, artwork approval, job management, purchasing, production, installation, costing, accounting handoff and reporting around the same sign work.

Can it manage both fabricated and printed signage?

Yes. Jobs can use the products, materials, suppliers, files, tasks and delivery route required for fabricated, illuminated, printed, wrapped or mixed sign work.

Does it connect production with purchasing and job costing?

Yes. Purchased inputs, receipts, supplier costs, production activity, labour and field work remain associated with the job so the final result can be compared with the accepted estimate.

Does SignBas3 replace accounting or file storage?

SignBas3 runs the sign manufacturing operation and connects its approved outputs with Xero (available), QuickBooks (certification in progress) or MYOB (coming soon). Job files can use Google Drive or Dropbox, keeping the operating workflow connected to the systems selected by the business.

Run a real sign manufacturing job in a demo